Projects

Example cases
from the field.

Every case follows the same structure: vessel type, problem, work done, technical solution and result. Boat names are not used without the client’s consent.

Case details are being updated with photos as clients approve.

Illustration: technician checking the hydraulic steering pump connections inside the helm console.Example caseIllustrative image

03 · Steering & control systems

17 m Motor Yacht — Hydraulic Steering System Revision

Vessel
Motor yacht · 17 m
Problem
Heavy steering, a difference in response between the two stations and a suspected leak in the hydraulic circuit.
Work done
Checks on pump, cylinder, lines and connections; revision of leak points, oil renewal and bleeding the system.
Technical solution
The source was found by testing pump, cylinder, valves and lines separately; the revision was carried out across the whole system.
Result
Handed over after a full lock-to-lock function test and a response check at both stations.

Photos: Field photos will be added with client approval

Illustration: technician servicing watermaker filters and the high-pressure pump.Example caseIllustrative image

06 · Watermaker systems

Watermaker — Winterization & Commissioning

Vessel
Motor yacht / sailing yacht
Problem
Membrane protection for a unit standing idle off-season; recommissioning at the start of the season.
Work done
Pre-filter and carbon filter checks, preservation (pickling) to the manufacturer’s procedure, flushing and commissioning at season start.
Technical solution
Chemical and contact time were set according to unit capacity and the manufacturer’s instructions.
Result
Handed over after checking pressure, flow and product water (TDS) values.

Photos: Field photos will be added with client approval

Illustration: technician servicing an anchor windlass on deck.Example caseIllustrative image

04 · Deck machinery & equipment

Windlass — Motor & Gearbox Renewal

Vessel
Yacht · windlass system
Problem
The windlass struggling, noise and loss of performance under load.
Work done
Separate checks of motor and gearbox, removal, motor and gearbox renewal, shaft, bearing and gypsy checks.
Technical solution
Motor and gearbox were assessed together; mechanical connections and power supply were checked.
Result
Handed over after a function test under load.

Photos: Field photos will be added with client approval

Illustration: technician inspecting a bilge pump and float switch under an open hatch with a flashlight.Example caseIllustrative image

07 · Bilge & emergency pump systems

Bilge System — Pump & Automatic Control Upgrade

Vessel
Motor yacht
Problem
A bilge pump not starting automatically and missing alarm infrastructure.
Work done
Pump selection and installation, level sensor / float switch, check valve and discharge line revision, high-water alarm installation.
Technical solution
Automatic, manual and alarm functions were set up as separate layers.
Result
Handed over after automatic start, manual override and alarm tests.

Photos: Field photos will be added with client approval

Illustration: technician working on a hydraulic power pack and valve block connections.Example caseIllustrative image

02 · Hydraulic systems

Hydraulic Power Unit — Motor & System Revision

Vessel
Yacht · hydraulic power unit
Problem
Loss of power, overheating and irregular operation in the hydraulic system.
Work done
Checks on the motor-pump group, valve block, filters and hoses; motor and system revision, oil and filter renewal.
Technical solution
Pressure, flow, oil condition and filtration were assessed together.
Result
Commissioned after pressure and function tests.

Photos: Field photos will be added with client approval

Project experience

Experience from shipyard
and yacht projects.

Selected field experience from mega yacht, new-build, refit and commercial vessel projects.

  • 2012

    Yıldız Shipyard / Perini Navi

    Hydraulic piping; hydraulic power units, valve systems, cylinders and actuators.

  • 2013–2014

    Sedef / Karpower

    Hydraulic hatches, valves, Danfoss multicore and hydraulic piping.

  • 2014

    Sanmar

    Hydraulic piping on a 10-tug project.

  • 2019–2020

    Damen

    2710 HST service catamarans; mechanical installation, hydraulics and fuel piping. Waterbus / pilot projects.

  • 2020–2021

    Bering

    3 new-build yachts; foreman, team management and quality control.

  • 2022–2023

    ArkYat / 44 m Andiamo

    Hydraulic system installation.

  • 2024–2025

    Ares / 61 m Simena

    Foreman.

  • Explore our technical background

    The full chronology, from Kılıç Denizcilik to HC MARIN WORKS, is on the About page.

Shipyard and project names are used as text only, to indicate projects worked on; they do not imply logo use or an official partnership.

Next step

Keeping you
at sea.

Share the system, your marina and what you need; if necessary we start with an on-site survey.